INTEGRATED PERIODIC TIMETABLE SCHEDULING – TOWARDS AN INTEGRATED TIMETABLE ACROSS CENTRAL EUROPE
Last modified: 2017-02-28
Abstract
The growing number of different European networks that follow ITF principles increases the demand for a multilateral, systematic approach towards international timetable coordination as well as infrastructure development to avoid incompatibilities of both timetables and infrastructural measures between the highly interlinked Central European countries.
Based upon several previous studies dealing with both the theoretical and especially mathematical principles as well as the practical application of ITF and ITF compliant infrastructure development, a systematic approach to a supra–regional integrated timetable is presented. It shows that infrastructure investment is substantially more effective if it follows a systematic and therefore ITF based operational concept. Especially the relatively small sizes of countries in the central and South–Eastern European area lead to a high level of mutual interdependency between current timetable development and future national infrastructure projects. We should therefore consider the forthcoming sizeable investments in railway infrastructure in a multilateral context to identify potential problems, aimed at taking full advantage of a future pan–European integrated timetable.