Track gauge monitoring scope optimization on small urban railway systems
Last modified: 2023-06-05
Abstract
Track geometry control has a major impact on availability and maintenance costs of public transport. Good management of rail infrastructure involves continuous monitoring of track geometry (track gauge, cant, twist, horizontal and vertical irregularities) where surveying should be done up to several times a year. Measuring of track geometry in chosen track cross-sections can be done automatically with relatively expensive equipment, or manually which is cheaper but takes longer. Therefore, the question arose as to whether it is possible on small urban railway networks to reduce monitoring scope by increasing of sampling distance, and if so, what should be recommended sampling distance.
This paper presents, on the example of the City of Osijek tramway system, how changes in sampling distance effects on track gauge parameter. The results of the conducted analyses are presented and discussed. The recommendations on track gauge monitoring scope optimization on small urban networks are made.